mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

During asexual reproduction yeast cells can produce _____
The first and second steps to solve the equation 3x/5 + 5 = 20.Are shown below 3x/5 + 5 - 5 = 20 - 5 3x/5 (5/3) = 15 (5/3)A.Addition Property of Equality B.Subt
on the basis of mesopotamian irrigation practices modern agriculture can conclude that _____________ irrigation is not appropriate for hot climates irrigation s
Length of a rectangle is 4 inches less than twice it’s width of the perimeter is 70 inches what’s the dimensions?
In triangle abc angle b is equal to 45 , a is equal to 24ft, and c is equal to 30ft. find b
Each court of appeals normally hears cases in panels consisting of ________ judge
The smaller of two numbers is 2 less than 3/4 the larger. The sum of the two numbers is 47. Find the value of the numbers.
Which cells in your body contain your entire DNA code? A) Nerve cells only B)Brain Cells Only C)All your cells
Find the area of the square with side lengths 1/6 foot
What type of topography should Carlos choose? Carlos does not have much money to spend on a new computer network, and he has also never installed a network befo