8 students take 18 hours to construct a raft.
If the raft needs to be completed 12 hours earlier, calculate how many more students are needed.

Respuesta :

devishri1977
devishri1977 devishri1977
  • 04-08-2021

Answer:

16

Step-by-step explanation:

Students                      8       x

Time taken (hours)     18     18 - 12 = 6

If number of students increases, the work will completed in less hours.

So inverse proportion

[tex]x =\frac{18*8}{6}=3*8 = 24[/tex]

Additional students required = 24 - 8 = 16

Answer Link

Otras preguntas

Ciara solved the exponential equation 3x+1 = 15 and her work is shown below. What is the first step she did incorrectly? Step 1: log 3x+1 = log15 Step 2: (x
how is the time, in hours, related to the number of times 2 is used as a factor
Which number families does the number 1 belong to??
How many moles of hydrogen gas would be needed to react with excess carbon dioxide to produce 19.1 moles of water vapor?
Q. Which of the following best describes why the Fairness Doctrine (with the exception of the "political editorial" and "personal attack" rules) did not contro
Which of the choices below is the best comparison of commensalism with parasitism? A) In both commensalism and parasitism, one organism benefits from the intera
Y=1.40x 14.25 solving for x
2N2H4 + N2O4 → 3N2 + 4H2O How many grams of N2H4 will be consumed by 92 g of N2O4? 16 g 128 g 64 g 32 g
Why did Washington order the Declaration of Independence read to the army? A.Because they did not have access to the newspapers carrying the information B.So th
143 divided by 7 puls [11-9]