maaf34nb8f maaf34nb8f
  • 01-04-2021
  • Engineering
contestada

A short framing member that fills the space
between the rough sill and the soleplate is a

Respuesta :

iBear25k
iBear25k iBear25k
  • 01-04-2021

A short framing member that fills the space between the rough sill and the soleplate is a cripple stud.

(HAVE A GOOD DAY!!!)

Answer Link

Otras preguntas

what is 1/9 of 60 equal
What is the 50th term of the arithmetic sequence 4, 10, 16, 22, … ? Can someone explain this one?
why a flat surface of a rectangular prism called faces?
Each verb below, one noun does not go with it. Which one? 1/ discover ( the truth, a cure, DNA, gold ) 2/ make ( cars, a discovery, a phone call ) 3/ tell ( hel
Randal answers 96 out of 120 questions correctly on a science exam. What percent of the questions did Randal answer correctly
What is the value of the 8 and 48?
What is the value of the 8 and 48?
How far does Franklin Roosevelt deserve his reputation as one of the greatest US presidents?
translate into an equation. Five times the sum of twice a number, x, and six is thirty. Find the number.x = Translate into an equation. The difference b
A person sees a ball and kicks it, in part because of actions of the nervous system. Using the parts of the nervous system listed bellow, describe the path of n