medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

Joel is driving down the highway and hits a deer that darts in front of his car. what insurance would cover the damage?A)collisionB)comprehensiveC)LiabilityD)Un
PLEASE HELP The table below represents a linear function f(x) and the equation represents a function g(x): x f(x) −1 −12 0 −6 1 0 g(x) g(x) = 2x + 6 Part A: Wr
george wanted to measure the angle of a waterslide at the lake .he used a sheet of folded paper that formed 20 degree angle. he measured and found that three of
The first law of thermodynamics states that ___. 1. When a process converts energy from one form to another, some energy converts into heat, an unusable form
someone plz help me find x and y in this angle
What is a catalyst?
a tool that uses lenses to focus light andcreate useful images​
ASAP help me please!!!!!!!!!!!!!!!!!!
What is a catalyst?
What property is illustrated in the equation? 7 + 1/2 = 1/2 + 7