​Finishing the construction of a home two days after the contract called for completion (no injury occurs) most likely will be considered

Respuesta :

andriansp andriansp
  • 08-06-2016
Finishing the construction for a longer period than the date that already agreed upon would be most likely considered : Breach of Contracts.
Which mean that the constructor basically fail to met his end of the contract agreement, causing the other party has the right to walk out from their contract
Answer Link

Otras preguntas

Electronic configuration of 11N
Desmond is 8 inches taller than Niki. If we let y represent Niki's height in inches, write an algebraic expression for Desmond's height.
discuss the ways in which you have seen an audience become part of a team in a live performance.
Which form of government has the most citizen participation? Why?
Evaluate the expression. Drag the answer into the box to match the expression. 3⋅(612610)
what is the answer for -9+x=-26
I don't know any of this ​
. Jessica went to the grocery store and purchased a box of cereal for $3.75, milk for $1.50, and bread for $2.25. She paid with a $20.00 bill. How much change d
If you travel 70000 M at a rate of 25 m/s and , how long does it take to complete the trip?
the Fish and seafood from the Northeastern region of the United Stats is taken from what ocean?